LIVE· MARKET
Tue 24 Nov 2026
GB power fundamentals, live today and the week so far.
Monday 23 Nov through yesterday, plus today's progression as
settlement periods clear.
Today's figures are a live, partial picture, not a final tally.
Fundamentals
Interconnectors
Generation
Imbalance price, latest
186.24 £/MWh
▼ 57.76 vs SP23 yesterday
Imbalance volume, latest
-610.6 MWh
SP23
Wind + curtailed, latest
20.44 GW
SP23
Solar output, latest
1.94 GW
SP24
Demand, latest
38.31 GW
SP24
Wind: actual, actual+curtailed & forecast
Mon 23 Nov 2026, MW · "actual+curtailed" adds capacity instructed off via the
Balancing Mechanism and lags real time by ~18 minutes (Elexon's own bid-acceptance publish delay), so it
trails plain actual by a period or two · forecast is the latest-published WINDFOR vintage
Actual
Actual+curtailed
Forecast
MW 0 5000 10000 15000 1 9 17 25 33 41 48 Settlement period SP1: Actual 7512 MW, Actual+curtailed 7512 MW, Forecast 7510 MW SP2: Actual 6609 MW, Actual+curtailed 6609 MW, Forecast 7510 MW SP3: Actual 6212 MW, Actual+curtailed 6212 MW, Forecast 6484 MW SP4: Actual 5827 MW, Actual+curtailed 5827 MW, Forecast 6484 MW SP5: Actual 5591 MW, Actual+curtailed 5591 MW, Forecast 5582 MW SP6: Actual 5513 MW, Actual+curtailed 5513 MW, Forecast 5582 MW SP7: Actual 5251 MW, Actual+curtailed 5251 MW, Forecast 5127 MW SP8: Actual 5092 MW, Actual+curtailed 5092 MW, Forecast 5127 MW SP9: Actual 5141 MW, Actual+curtailed 5141 MW, Forecast 4986 MW SP10: Actual 4911 MW, Actual+curtailed 4911 MW, Forecast 4986 MW SP11: Actual 4745 MW, Actual+curtailed 4745 MW, Forecast 4534 MW SP12: Actual 4626 MW, Actual+curtailed 4626 MW, Forecast 4534 MW SP13: Actual 4507 MW, Actual+curtailed 4562.85 MW, Forecast 4454 MW SP14: Actual 4087 MW, Actual+curtailed 4248 MW, Forecast 4454 MW SP15: Actual 3853 MW, Actual+curtailed 4010 MW, Forecast 4798 MW SP16: Actual 3959 MW, Actual+curtailed 4237.01 MW, Forecast 4798 MW SP17: Actual 4275 MW, Actual+curtailed 4625 MW, Forecast 4984 MW SP18: Actual 4287 MW, Actual+curtailed 4654.5 MW, Forecast 4984 MW SP19: Actual 4455 MW, Actual+curtailed 4832 MW, Forecast 5201 MW SP20: Actual 4526 MW, Actual+curtailed 4925 MW, Forecast 5201 MW SP21: Actual 4863 MW, Actual+curtailed 5280 MW, Forecast 5492 MW SP22: Actual 5140 MW, Actual+curtailed 5566 MW, Forecast 5492 MW SP23: Actual 5251 MW, Actual+curtailed 5683 MW, Forecast 5645 MW SP24: Actual 5329 MW, Actual+curtailed 5781 MW, Forecast 5645 MW SP25: Actual 5364 MW, Actual+curtailed 5809.15 MW, Forecast 5788 MW SP26: Actual 5412 MW, Actual+curtailed 5785.38 MW, Forecast 5788 MW SP27: Actual 5643 MW, Actual+curtailed 5988 MW, Forecast 5700 MW SP28: Actual 5925 MW, Actual+curtailed 6253 MW, Forecast 5700 MW SP29: Actual 6125 MW, Actual+curtailed 6471.15 MW, Forecast 6340 MW SP30: Actual 6392 MW, Actual+curtailed 6794 MW, Forecast 6340 MW SP31: Actual 6691 MW, Actual+curtailed 7064.33 MW, Forecast 7291 MW SP32: Actual 7209 MW, Actual+curtailed 7417.2 MW, Forecast 7291 MW SP33: Actual 7672 MW, Actual+curtailed 7859.08 MW, Forecast 7922 MW SP34: Actual 7776 MW, Actual+curtailed 7937.02 MW, Forecast 7922 MW SP35: Actual 8092 MW, Actual+curtailed 8342.42 MW, Forecast 8200 MW SP36: Actual 8562 MW, Actual+curtailed 9057.54 MW, Forecast 8200 MW SP37: Actual 9022 MW, Actual+curtailed 10054.8 MW, Forecast 9280 MW SP38: Actual 9221 MW, Actual+curtailed 10495.7 MW, Forecast 9280 MW SP39: Actual 9416 MW, Actual+curtailed 10969.3 MW, Forecast 9933 MW SP40: Actual 9807 MW, Actual+curtailed 11522.8 MW, Forecast 9933 MW SP41: Actual 10197 MW, Actual+curtailed 12253.9 MW, Forecast 10622 MW SP42: Actual 10383 MW, Actual+curtailed 12832.3 MW, Forecast 10622 MW SP43: Actual 10639 MW, Actual+curtailed 13184.1 MW, Forecast 11181 MW SP44: Actual 10764 MW, Actual+curtailed 13386.8 MW, Forecast 11181 MW SP45: Actual 10849 MW, Actual+curtailed 13634.2 MW, Forecast 11511 MW SP46: Actual 10846 MW, Actual+curtailed 13800.3 MW, Forecast 11511 MW SP47: Actual 10747 MW, Actual+curtailed 14031.1 MW, Forecast 12165 MW SP48: Actual 10862 MW, Actual+curtailed 14365.5 MW, Forecast 12165 MW
Demand: actual vs forecast
Mon 23 Nov 2026, MW · actual is the Indicative National Demand Outturn (INDO)
· forecast is the latest-published National Demand Forecast (NDF) vintage
Actual
Forecast
MW 25000 30000 35000 40000 45000 1 9 17 25 33 41 48 Settlement period SP1: Actual 27963 MW, Forecast 27850 MW SP2: Actual 29038 MW, Forecast 28400 MW SP3: Actual 28646 MW, Forecast 28312 MW SP4: Actual 27778 MW, Forecast 27893 MW SP5: Actual 27733 MW, Forecast 27221 MW SP6: Actual 27063 MW, Forecast 26935 MW SP7: Actual 26575 MW, Forecast 26516 MW SP8: Actual 26111 MW, Forecast 25834 MW SP9: Actual 25760 MW, Forecast 25759 MW SP10: Actual 25864 MW, Forecast 25500 MW SP11: Actual 25859 MW, Forecast 26048 MW SP12: Actual 26980 MW, Forecast 26531 MW SP13: Actual 29799 MW, Forecast 29344 MW SP14: Actual 32178 MW, Forecast 32146 MW SP15: Actual 35607 MW, Forecast 34976 MW SP16: Actual 36891 MW, Forecast 36300 MW SP17: Actual 39124 MW, Forecast 38600 MW SP18: Actual 39530 MW, Forecast 38476 MW SP19: Actual 39759 MW, Forecast 38518 MW SP20: Actual 39328 MW, Forecast 38231 MW SP21: Actual 38601 MW, Forecast 37385 MW SP22: Actual 37961 MW, Forecast 36787 MW SP23: Actual 37499 MW, Forecast 36488 MW SP24: Actual 37306 MW, Forecast 36053 MW SP25: Actual 37298 MW, Forecast 36339 MW SP26: Actual 37331 MW, Forecast 36600 MW SP27: Actual 37246 MW, Forecast 36800 MW SP28: Actual 37435 MW, Forecast 37191 MW SP29: Actual 37778 MW, Forecast 37609 MW SP30: Actual 38397 MW, Forecast 38444 MW SP31: Actual 39019 MW, Forecast 39403 MW SP32: Actual 40463 MW, Forecast 40444 MW SP33: Actual 41850 MW, Forecast 41351 MW SP34: Actual 42812 MW, Forecast 42479 MW SP35: Actual 43087 MW, Forecast 43300 MW SP36: Actual 43134 MW, Forecast 43226 MW SP37: Actual 43031 MW, Forecast 42695 MW SP38: Actual 42367 MW, Forecast 42115 MW SP39: Actual 41562 MW, Forecast 41531 MW SP40: Actual 40513 MW, Forecast 40960 MW SP41: Actual 39443 MW, Forecast 39716 MW SP42: Actual 38198 MW, Forecast 38100 MW SP43: Actual 36461 MW, Forecast 36512 MW SP44: Actual 34463 MW, Forecast 34505 MW SP45: Actual 32704 MW, Forecast 32320 MW SP46: Actual 30775 MW, Forecast 30546 MW SP47: Actual 29241 MW, Forecast 28869 MW SP48: Actual 28092 MW, Forecast 28000 MW
Solar: actual vs forecast
Mon 23 Nov 2026, MW · forecast is NESO's embedded solar forecast
Actual
Forecast
MW 0 2000 4000 6000 8000 1 9 17 25 33 41 48 Settlement period SP1: Actual 0 MW, Forecast 0 MW SP2: Actual 0 MW, Forecast 0 MW SP3: Actual 0 MW, Forecast 0 MW SP4: Actual 0 MW, Forecast 0 MW SP5: Actual 0 MW, Forecast 0 MW SP6: Actual 0 MW, Forecast 0 MW SP7: Actual 0 MW, Forecast 0 MW SP8: Actual 0 MW, Forecast 0 MW SP9: Actual 0 MW, Forecast 0 MW SP10: Actual 0 MW, Forecast 0 MW SP11: Actual 0 MW, Forecast 0 MW SP12: Actual 0 MW, Forecast 0 MW SP13: Actual 0 MW, Forecast 0 MW SP14: Actual 0 MW, Forecast 0 MW SP15: Actual 0 MW, Forecast 11 MW SP16: Actual 6.44 MW, Forecast 145 MW SP17: Actual 364.9 MW, Forecast 267 MW SP18: Actual 1278.42 MW, Forecast 778 MW SP19: Actual 2407.09 MW, Forecast 1567 MW SP20: Actual 3417.02 MW, Forecast 2547 MW SP21: Actual 4180.95 MW, Forecast 3430 MW SP22: Actual 4971.24 MW, Forecast 3965 MW SP23: Actual 5815.59 MW, Forecast 4215 MW SP24: Actual 6219.62 MW, Forecast 4382 MW SP25: Actual 6358.6 MW, Forecast 4414 MW SP26: Actual 6392.15 MW, Forecast 4241 MW SP27: Actual 5962.2 MW, Forecast 3967 MW SP28: Actual 4703.5 MW, Forecast 3282 MW SP29: Actual 3584.89 MW, Forecast 2263 MW SP30: Actual 2080.61 MW, Forecast 1408 MW SP31: Actual 702.39 MW, Forecast 571 MW SP32: Actual 84.07 MW, Forecast 240 MW SP33: Actual 0 MW, Forecast 40 MW SP34: Actual 0 MW, Forecast 0 MW SP35: Actual 0 MW, Forecast 0 MW SP36: Actual 0 MW, Forecast 0 MW SP37: Actual 0 MW, Forecast 0 MW SP38: Actual 0 MW, Forecast 0 MW SP39: Actual 0 MW, Forecast 0 MW SP40: Actual 0 MW, Forecast 0 MW SP41: Actual 0 MW, Forecast 0 MW SP42: Actual 0 MW, Forecast 0 MW SP43: Actual 0 MW, Forecast 0 MW SP44: Actual 0 MW, Forecast 0 MW SP45: Actual 0 MW, Forecast 0 MW SP46: Actual 0 MW, Forecast 0 MW SP47: Actual 0 MW, Forecast 0 MW SP48: Actual 0 MW, Forecast 0 MW
Imbalance: price & volume
Mon 23 Nov 2026 · price (left axis, £/MWh) is the same systemSellPrice shown above
· volume (right axis, MWh) is the Net Imbalance Volume (NIV) for the settlement period, and can be
negative
Price
Volume
£/MWh 150 200 250 300 MWh -1000 -500 0 500 1000 1 9 17 25 33 41 48 Settlement period SP1: 150.5 £/MWh, -92.7 MWh SP2: 150.2 £/MWh, -433.1 MWh SP3: 151 £/MWh, -252.54 MWh SP4: 168.88 £/MWh, 37.51 MWh SP5: 152 £/MWh, -246.17 MWh SP6: 152 £/MWh, -58.75 MWh SP7: 151.9 £/MWh, -217.79 MWh SP8: 151.7 £/MWh, -192.82 MWh SP9: 152 £/MWh, -40.09 MWh SP10: 151.7 £/MWh, -585.97 MWh SP11: 210.9 £/MWh, 29.53 MWh SP12: 152.9 £/MWh, -155.54 MWh SP13: 210.9 £/MWh, 66.66 MWh SP14: 258 £/MWh, 224.52 MWh SP15: 258 £/MWh, 268.37 MWh SP16: 254 £/MWh, 295.75 MWh SP17: 158.64 £/MWh, -283.38 MWh SP18: 160.91 £/MWh, -127.49 MWh SP19: 232.45 £/MWh, 122.52 MWh SP20: 255 £/MWh, 303.18 MWh SP21: 229.31 £/MWh, 155.26 MWh SP22: 212.9 £/MWh, 113.8 MWh SP23: 244 £/MWh, 152.28 MWh SP24: 182.02 £/MWh, -20.86 MWh SP25: 239 £/MWh, 291.01 MWh SP26: 239 £/MWh, 342.04 MWh SP27: 192.16 £/MWh, 9.31 MWh SP28: 196 £/MWh, 283.06 MWh SP29: 232.38 £/MWh, 485.07 MWh SP30: 233 £/MWh, 504.43 MWh SP31: 242.09 £/MWh, 476.14 MWh SP32: 242.82 £/MWh, 599.76 MWh SP33: 257.34 £/MWh, 556.94 MWh SP34: 258.8 £/MWh, 643.31 MWh SP35: 263.7 £/MWh, 586.47 MWh SP36: 261.32 £/MWh, 344.19 MWh SP37: 256.69 £/MWh, 13.56 MWh SP38: 256.8 £/MWh, 213.17 MWh SP39: 246.74 £/MWh, 484.88 MWh SP40: 244 £/MWh, 239.69 MWh SP41: 221.58 £/MWh, 217.89 MWh SP42: 171.75 £/MWh, -173.21 MWh SP43: 208.3 £/MWh, 148.6 MWh SP44: 207.06 £/MWh, 33.08 MWh SP45: 151.37 £/MWh, -163.39 MWh SP46: 175.54 £/MWh, -175.91 MWh SP47: 210 £/MWh, 119.24 MWh SP48: 210 £/MWh, 206.61 MWh
Mon 23 Nov 2026 — a complete day, not live.
Monday–yesterday, daily averages
Hover a figure for that day's peak and trough.
Scheduled (ENTSO-E for the continental links, SEMO for the Irish ones) vs actual metered
flow per link, right now (+import / −export). Chart below follows the day picked below.
Actual
Scheduled
BritNed NL
134 MW
Overperforming by
~453 MW, since SP11
MW -1000 -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 1052 MW, Forecast 1076 MW SP2: Actual 1054 MW, Forecast 1076 MW SP3: Actual 1054 MW, Forecast 1075 MW SP4: Actual 1054 MW, Forecast 1075 MW SP5: Actual 1052 MW, Forecast 1074 MW SP6: Actual 1052 MW, Forecast 1074 MW SP7: Actual 1052 MW, Forecast 1074 MW SP8: Actual 1052 MW, Forecast 1074 MW SP9: Actual 896 MW, Forecast 913 MW SP10: Actual 766 MW, Forecast 913 MW SP11: Actual 0 MW, Forecast 7 MW SP12: Actual 0 MW, Forecast 7 MW SP13: Actual -104 MW, Forecast -75 MW SP14: Actual -102 MW, Forecast -75 MW SP15: Actual 122 MW, Forecast 128 MW SP16: Actual 130 MW, Forecast 128 MW SP17: Actual 396 MW, Forecast 408 MW SP18: Actual 402 MW, Forecast 408 MW SP19: Actual 576 MW, Forecast 589 MW SP20: Actual 602 MW, Forecast 589 MW SP21: Actual 972 MW, Forecast 994 MW SP22: Actual 974 MW, Forecast 994 MW SP23: Actual 912 MW, Forecast 927 MW SP24: Actual 914 MW, Forecast 927 MW SP25: Actual 1054 MW, Forecast 1076 MW SP26: Actual 1054 MW, Forecast 1076 MW SP27: Actual 590 MW, Forecast 546 MW SP28: Actual 532 MW, Forecast 546 MW SP29: Actual 228 MW, Forecast 227 MW SP30: Actual 226 MW, Forecast 227 MW SP31: Actual 386 MW, Forecast 394 MW SP32: Actual 392 MW, Forecast 394 MW SP33: Actual 742 MW, Forecast 763 MW SP34: Actual 712 MW, Forecast 763 MW SP35: Actual 342 MW, Forecast 348 MW SP36: Actual 344 MW, Forecast 348 MW SP37: Actual 588 MW, Forecast 603 MW SP38: Actual 556 MW, Forecast 603 MW SP39: Actual 102 MW, Forecast 55 MW SP40: Actual 100 MW, Forecast 55 MW SP41: Actual -240 MW, Forecast -252 MW SP42: Actual -252 MW, Forecast -252 MW SP43: Actual -336 MW, Forecast -338 MW SP44: Actual -340 MW, Forecast -338 MW SP45: Actual -636 MW, Forecast -643 MW SP46: Actual -640 MW, Forecast -643 MW SP47: Actual -470 MW SP48: Actual -468 MW
East-West IRL
-532 MW
MW -200 0 200 400 600 1 9 17 25 33 41 48 Settlement period SP1: Actual -62 MW, Forecast -68.9 MW SP2: Actual -4 MW, Forecast 0 MW SP3: Actual 0 MW, Forecast 0 MW SP4: Actual 0 MW, Forecast 0 MW SP5: Actual 0 MW, Forecast 0 MW SP6: Actual 0 MW, Forecast 0 MW SP7: Actual 0 MW, Forecast 0 MW SP8: Actual 0 MW, Forecast 0 MW SP9: Actual 0 MW, Forecast 0 MW SP10: Actual 0 MW, Forecast 0 MW SP11: Actual 54 MW, Forecast 149.9 MW SP12: Actual 36 MW, Forecast 26.3 MW SP13: Actual 82 MW, Forecast 176.2 MW SP14: Actual 34 MW, Forecast 33.3 MW SP15: Actual 0 MW, Forecast 0 MW SP16: Actual 0 MW, Forecast 0 MW SP17: Actual 0 MW, Forecast 0 MW SP18: Actual 0 MW, Forecast 0 MW SP19: Actual 0 MW, Forecast 0 MW SP20: Actual 0 MW, Forecast 0 MW SP21: Actual 0 MW, Forecast 0 MW SP22: Actual 0 MW, Forecast 0 MW SP23: Actual 60 MW, Forecast 103.1 MW SP24: Actual 90 MW, Forecast 41.1 MW SP25: Actual 90 MW, Forecast 14.4 MW SP26: Actual 90 MW, Forecast 58.5 MW SP27: Actual 90 MW, Forecast 168.3 MW SP28: Actual 90 MW, Forecast 293.1 MW SP29: Actual 90 MW, Forecast 342.5 MW SP30: Actual 90 MW, Forecast 353.9 MW SP31: Actual 90 MW, Forecast 500 MW SP32: Actual 90 MW, Forecast 500 MW SP33: Actual 90 MW, Forecast 499.9 MW SP34: Actual 90 MW, Forecast 376 MW SP35: Actual 90 MW, Forecast 306.8 MW SP36: Actual 90 MW, Forecast 227.8 MW SP37: Actual 90 MW, Forecast 143.4 MW SP38: Actual 86 MW, Forecast 122.2 MW SP39: Actual 10 MW, Forecast 0 MW SP40: Actual 0 MW, Forecast 0 MW SP41: Actual 10 MW, Forecast 0 MW SP42: Actual 94 MW, Forecast 92.6 MW SP43: Actual 40 MW, Forecast 8.3 MW SP44: Actual 90 MW, Forecast 158.3 MW SP45: Actual 90 MW, Forecast 141.5 MW SP46: Actual 90 MW, Forecast 243.4 MW SP47: Actual 90 MW, Forecast 100.5 MW SP48: Actual 60 MW, Forecast -21.2 MW
ElecLink FR
146 MW
Overperforming by
~256 MW, since SP7
MW -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 1000 MW, Forecast 1014 MW SP2: Actual 1002 MW, Forecast 1014 MW SP3: Actual 1002 MW, Forecast 1014 MW SP4: Actual 1002 MW, Forecast 1014 MW SP5: Actual 1002 MW, Forecast 1014 MW SP6: Actual 1002 MW, Forecast 1014 MW SP7: Actual 1002 MW, Forecast 1014 MW SP8: Actual 1002 MW, Forecast 1014 MW SP9: Actual 824 MW, Forecast 826 MW SP10: Actual 794 MW, Forecast 826 MW SP11: Actual 328 MW, Forecast 305 MW SP12: Actual 286 MW, Forecast 305 MW SP13: Actual -66 MW, Forecast -79 MW SP14: Actual -76 MW, Forecast -79 MW SP15: Actual 104 MW, Forecast 113 MW SP16: Actual 120 MW, Forecast 113 MW SP17: Actual 332 MW, Forecast 346 MW SP18: Actual 356 MW, Forecast 346 MW SP19: Actual 668 MW, Forecast 691 MW SP20: Actual 674 MW, Forecast 691 MW SP21: Actual 474 MW, Forecast 471 MW SP22: Actual 466 MW, Forecast 471 MW SP23: Actual 456 MW, Forecast 462 MW SP24: Actual 460 MW, Forecast 462 MW SP25: Actual 556 MW, Forecast 567 MW SP26: Actual 558 MW, Forecast 567 MW SP27: Actual 458 MW, Forecast 458 MW SP28: Actual 438 MW, Forecast 458 MW SP29: Actual 110 MW, Forecast 95 MW SP30: Actual 106 MW, Forecast 95 MW SP31: Actual 354 MW, Forecast 368 MW SP32: Actual 362 MW, Forecast 368 MW SP33: Actual 272 MW, Forecast 270 MW SP34: Actual 272 MW, Forecast 270 MW SP35: Actual 388 MW, Forecast 398 MW SP36: Actual 396 MW, Forecast 398 MW SP37: Actual 462 MW, Forecast 470 MW SP38: Actual 462 MW, Forecast 470 MW SP39: Actual 376 MW, Forecast 377 MW SP40: Actual 368 MW, Forecast 377 MW SP41: Actual 280 MW, Forecast 279 MW SP42: Actual 272 MW, Forecast 279 MW SP43: Actual 158 MW, Forecast 154 MW SP44: Actual 136 MW, Forecast 154 MW SP45: Actual -260 MW, Forecast -272 MW SP46: Actual -280 MW, Forecast -272 MW SP47: Actual -388 MW SP48: Actual -380 MW
Greenlink IRL
-514 MW
MW -1000 -500 0 500 1000 1 9 17 25 33 41 48 Settlement period SP1: Actual -514 MW, Forecast -513 MW SP2: Actual -514 MW, Forecast -513 MW SP3: Actual -514 MW, Forecast -513 MW SP4: Actual -514 MW, Forecast -513 MW SP5: Actual -514 MW, Forecast -513 MW SP6: Actual -460 MW, Forecast -462.3 MW SP7: Actual -322 MW, Forecast -309.1 MW SP8: Actual -170 MW, Forecast -155.9 MW SP9: Actual -22 MW, Forecast -2.7 MW SP10: Actual 72 MW, Forecast 147.4 MW SP11: Actual 206 MW, Forecast 297.3 MW SP12: Actual 240 MW, Forecast 447.3 MW SP13: Actual 240 MW, Forecast 503.9 MW SP14: Actual 240 MW, Forecast 503.9 MW SP15: Actual 240 MW, Forecast 393.4 MW SP16: Actual 240 MW, Forecast 297.5 MW SP17: Actual 240 MW, Forecast 417 MW SP18: Actual 240 MW, Forecast 426.6 MW SP19: Actual 240 MW, Forecast 499.9 MW SP20: Actual 240 MW, Forecast 503.9 MW SP21: Actual 240 MW, Forecast 465.6 MW SP22: Actual 240 MW, Forecast 484.6 MW SP23: Actual 240 MW, Forecast 503.9 MW SP24: Actual 240 MW, Forecast 503.9 MW SP25: Actual 240 MW, Forecast 503.9 MW SP26: Actual 240 MW, Forecast 503.9 MW SP27: Actual 240 MW, Forecast 503.9 MW SP28: Actual 240 MW, Forecast 503.9 MW SP29: Actual 240 MW, Forecast 503.9 MW SP30: Actual 240 MW, Forecast 503.9 MW SP31: Actual 240 MW, Forecast 503.9 MW SP32: Actual 240 MW, Forecast 503.9 MW SP33: Actual 240 MW, Forecast 503.9 MW SP34: Actual 240 MW, Forecast 503.9 MW SP35: Actual 240 MW, Forecast 503.9 MW SP36: Actual 240 MW, Forecast 503.9 MW SP37: Actual 240 MW, Forecast 503.9 MW SP38: Actual 240 MW, Forecast 503.9 MW SP39: Actual 240 MW, Forecast 503.9 MW SP40: Actual 240 MW, Forecast 499.2 MW SP41: Actual 240 MW, Forecast 433.6 MW SP42: Actual 240 MW, Forecast 292.2 MW SP43: Actual 240 MW, Forecast 443.7 MW SP44: Actual 240 MW, Forecast 454.6 MW SP45: Actual 240 MW, Forecast 412.4 MW SP46: Actual 240 MW, Forecast 400 MW SP47: Actual 240 MW, Forecast 257.5 MW SP48: Actual 172 MW, Forecast 110.6 MW
IFA FR
-212 MW
Overperforming by
~373 MW, since SP1
MW -1000 -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 1002 MW, Forecast 1000 MW SP2: Actual 1002 MW, Forecast 1000 MW SP3: Actual 1002 MW, Forecast 1000 MW SP4: Actual 1002 MW, Forecast 1000 MW SP5: Actual 1002 MW, Forecast 1000 MW SP6: Actual 1002 MW, Forecast 1000 MW SP7: Actual 1002 MW, Forecast 1000 MW SP8: Actual 1002 MW, Forecast 1000 MW SP9: Actual 972 MW, Forecast 968 MW SP10: Actual 954 MW, Forecast 968 MW SP11: Actual 428 MW, Forecast 391 MW SP12: Actual 386 MW, Forecast 391 MW SP13: Actual -208 MW, Forecast -251 MW SP14: Actual -252 MW, Forecast -251 MW SP15: Actual 214 MW, Forecast 258 MW SP16: Actual 262 MW, Forecast 258 MW SP17: Actual 424 MW, Forecast 431 MW SP18: Actual 442 MW, Forecast 431 MW SP19: Actual 872 MW, Forecast 890 MW SP20: Actual 890 MW, Forecast 890 MW SP21: Actual 806 MW, Forecast 798 MW SP22: Actual 802 MW, Forecast 798 MW SP23: Actual 860 MW, Forecast 860 MW SP24: Actual 864 MW, Forecast 860 MW SP25: Actual 858 MW, Forecast 855 MW SP26: Actual 856 MW, Forecast 855 MW SP27: Actual 730 MW, Forecast 723 MW SP28: Actual 718 MW, Forecast 723 MW SP29: Actual 320 MW, Forecast 302 MW SP30: Actual 314 MW, Forecast 302 MW SP31: Actual 776 MW, Forecast 795 MW SP32: Actual 798 MW, Forecast 795 MW SP33: Actual 690 MW, Forecast 684 MW SP34: Actual 682 MW, Forecast 684 MW SP35: Actual 414 MW, Forecast 401 MW SP36: Actual 406 MW, Forecast 401 MW SP37: Actual 568 MW, Forecast 575 MW SP38: Actual 576 MW, Forecast 575 MW SP39: Actual 454 MW, Forecast 447 MW SP40: Actual 440 MW, Forecast 447 MW SP41: Actual 116 MW, Forecast 100 MW SP42: Actual 100 MW, Forecast 100 MW SP43: Actual 8 MW, Forecast 42 MW SP44: Actual -2 MW, Forecast 42 MW SP45: Actual -68 MW, Forecast -67 MW SP46: Actual -82 MW, Forecast -67 MW SP47: Actual -678 MW SP48: Actual -696 MW
IFA2 FR
218 MW
Overperforming by
~293 MW, since SP13
MW -1000 -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 990 MW, Forecast 1014 MW SP2: Actual 992 MW, Forecast 1014 MW SP3: Actual 992 MW, Forecast 1014 MW SP4: Actual 994 MW, Forecast 1014 MW SP5: Actual 994 MW, Forecast 1014 MW SP6: Actual 994 MW, Forecast 1014 MW SP7: Actual 992 MW, Forecast 1014 MW SP8: Actual 992 MW, Forecast 1014 MW SP9: Actual 940 MW, Forecast 957 MW SP10: Actual 914 MW, Forecast 957 MW SP11: Actual 374 MW, Forecast 350 MW SP12: Actual 326 MW, Forecast 350 MW SP13: Actual -44 MW, Forecast -56 MW SP14: Actual -60 MW, Forecast -56 MW SP15: Actual -30 MW, Forecast -23 MW SP16: Actual -6 MW, Forecast -23 MW SP17: Actual 488 MW, Forecast 522 MW SP18: Actual 520 MW, Forecast 522 MW SP19: Actual 738 MW, Forecast 764 MW SP20: Actual 740 MW, Forecast 764 MW SP21: Actual 524 MW, Forecast 524 MW SP22: Actual 506 MW, Forecast 524 MW SP23: Actual 342 MW, Forecast 343 MW SP24: Actual 344 MW, Forecast 343 MW SP25: Actual 544 MW, Forecast 564 MW SP26: Actual 548 MW, Forecast 564 MW SP27: Actual 450 MW, Forecast 454 MW SP28: Actual 438 MW, Forecast 454 MW SP29: Actual 276 MW, Forecast 275 MW SP30: Actual 278 MW, Forecast 275 MW SP31: Actual 502 MW, Forecast 524 MW SP32: Actual 504 MW, Forecast 524 MW SP33: Actual 314 MW, Forecast 312 MW SP34: Actual 298 MW, Forecast 312 MW SP35: Actual 158 MW, Forecast 157 MW SP36: Actual 150 MW, Forecast 157 MW SP37: Actual 114 MW, Forecast 118 MW SP38: Actual 114 MW, Forecast 118 MW SP39: Actual 146 MW, Forecast 154 MW SP40: Actual 146 MW, Forecast 154 MW SP41: Actual 96 MW, Forecast 99 MW SP42: Actual 88 MW, Forecast 99 MW SP43: Actual -24 MW, Forecast -25 MW SP44: Actual -34 MW, Forecast -25 MW SP45: Actual -104 MW, Forecast -102 MW SP46: Actual -128 MW, Forecast -102 MW SP47: Actual -590 MW SP48: Actual -590 MW
Moyle N.IRL
-250 MW
MW -400 -200 0 200 400 1 9 17 25 33 41 48 Settlement period SP1: Actual -250 MW, Forecast -250 MW SP2: Actual -180 MW, Forecast -178.8 MW SP3: Actual -142 MW, Forecast -130.7 MW SP4: Actual -58 MW, Forecast -59 MW SP5: Actual -150 MW, Forecast -148.6 MW SP6: Actual -178 MW, Forecast -177.9 MW SP7: Actual -250 MW, Forecast -250 MW SP8: Actual -192 MW, Forecast -177.6 MW SP9: Actual -42 MW, Forecast -24 MW SP10: Actual 76 MW, Forecast 77.9 MW SP11: Actual 130 MW, Forecast 227.9 MW SP12: Actual 130 MW, Forecast 243.9 MW SP13: Actual 130 MW, Forecast 243.9 MW SP14: Actual 130 MW, Forecast 220.5 MW SP15: Actual 74 MW, Forecast 74 MW SP16: Actual 16 MW, Forecast 0 MW SP17: Actual 16 MW, Forecast 0 MW SP18: Actual 16 MW, Forecast 0 MW SP19: Actual 16 MW, Forecast 0 MW SP20: Actual 56 MW, Forecast 55.9 MW SP21: Actual 16 MW, Forecast 0 MW SP22: Actual 16 MW, Forecast 0 MW SP23: Actual 86 MW, Forecast 150 MW SP24: Actual 130 MW, Forecast 243.9 MW SP25: Actual 130 MW, Forecast 243.9 MW SP26: Actual 130 MW, Forecast 243.9 MW SP27: Actual 130 MW, Forecast 243.9 MW SP28: Actual 130 MW, Forecast 243.9 MW SP29: Actual 130 MW, Forecast 243.9 MW SP30: Actual 130 MW, Forecast 243.9 MW SP31: Actual 130 MW, Forecast 243.9 MW SP32: Actual 130 MW, Forecast 243.9 MW SP33: Actual 130 MW, Forecast 243.9 MW SP34: Actual 130 MW, Forecast 243.9 MW SP35: Actual 130 MW, Forecast 243.9 MW SP36: Actual 130 MW, Forecast 243.9 MW SP37: Actual 130 MW, Forecast 243.9 MW SP38: Actual 130 MW, Forecast 243.9 MW SP39: Actual 130 MW, Forecast 216.4 MW SP40: Actual 118 MW, Forecast 92.1 MW SP41: Actual 178 MW, Forecast 230.2 MW SP42: Actual 180 MW, Forecast 243.9 MW SP43: Actual 180 MW, Forecast 243.9 MW SP44: Actual 180 MW, Forecast 243.9 MW SP45: Actual 180 MW, Forecast 243.9 MW SP46: Actual 180 MW, Forecast 243.9 MW SP47: Actual 156 MW, Forecast 97.4 MW SP48: Actual 6 MW, Forecast -50.2 MW
Nemo BE
-434 MW
MW -1000 -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 996 MW, Forecast 1012 MW SP2: Actual 998 MW, Forecast 1012 MW SP3: Actual 998 MW, Forecast 1012 MW SP4: Actual 998 MW, Forecast 1012 MW SP5: Actual 996 MW, Forecast 1012 MW SP6: Actual 998 MW, Forecast 1012 MW SP7: Actual 998 MW, Forecast 1012 MW SP8: Actual 998 MW, Forecast 1012 MW SP9: Actual 896 MW, Forecast 910 MW SP10: Actual 870 MW, Forecast 910 MW SP11: Actual 116 MW, Forecast 83 MW SP12: Actual 66 MW, Forecast 83 MW SP13: Actual -518 MW, Forecast -530 MW SP14: Actual -522 MW, Forecast -530 MW SP15: Actual 2 MW, Forecast 14 MW SP16: Actual 26 MW, Forecast 14 MW SP17: Actual 538 MW, Forecast 560 MW SP18: Actual 552 MW, Forecast 560 MW SP19: Actual 682 MW, Forecast 692 MW SP20: Actual 678 MW, Forecast 692 MW SP21: Actual 362 MW, Forecast 362 MW SP22: Actual 366 MW, Forecast 362 MW SP23: Actual 824 MW, Forecast 846 MW SP24: Actual 832 MW, Forecast 846 MW SP25: Actual 650 MW, Forecast 658 MW SP26: Actual 646 MW, Forecast 658 MW SP27: Actual 432 MW, Forecast 437 MW SP28: Actual 430 MW, Forecast 437 MW SP29: Actual 456 MW, Forecast 463 MW SP30: Actual 456 MW, Forecast 463 MW SP31: Actual 392 MW, Forecast 397 MW SP32: Actual 390 MW, Forecast 397 MW SP33: Actual 206 MW, Forecast 206 MW SP34: Actual 204 MW, Forecast 206 MW SP35: Actual 184 MW, Forecast 186 MW SP36: Actual 184 MW, Forecast 186 MW SP37: Actual 136 MW, Forecast 137 MW SP38: Actual 136 MW, Forecast 137 MW SP39: Actual 244 MW, Forecast 249 MW SP40: Actual 240 MW, Forecast 249 MW SP41: Actual -82 MW, Forecast -84 MW SP42: Actual -86 MW, Forecast -84 MW SP43: Actual -98 MW, Forecast -95 MW SP44: Actual -102 MW, Forecast -95 MW SP45: Actual -436 MW, Forecast -439 MW SP46: Actual -446 MW, Forecast -439 MW SP47: Actual -842 MW SP48: Actual -836 MW
North Sea Link NO
-578 MW
MW -500 0 500 1000 1500 1 9 17 25 33 41 48 Settlement period SP1: Actual 1396 MW, Forecast 1449 MW SP2: Actual 1400 MW, Forecast 1449 MW SP3: Actual 1400 MW, Forecast 1449 MW SP4: Actual 1400 MW, Forecast 1449 MW SP5: Actual 1400 MW, Forecast 1449 MW SP6: Actual 1400 MW, Forecast 1449 MW SP7: Actual 1400 MW, Forecast 1449 MW SP8: Actual 1388 MW, Forecast 1449 MW SP9: Actual 960 MW, Forecast 952.8 MW SP10: Actual 908 MW, Forecast 952.8 MW SP11: Actual 792 MW, Forecast 804.5 MW SP12: Actual 760 MW, Forecast 804.5 MW SP13: Actual 606 MW, Forecast 610.4 MW SP14: Actual 594 MW, Forecast 610.4 MW SP15: Actual 634 MW, Forecast 661.6 MW SP16: Actual 666 MW, Forecast 661.6 MW SP17: Actual 954 MW, Forecast 1019 MW SP18: Actual 970 MW, Forecast 1019 MW SP19: Actual 832 MW, Forecast 846.9 MW SP20: Actual 786 MW, Forecast 846.9 MW SP21: Actual 472 MW, Forecast 455.4 MW SP22: Actual 404 MW, Forecast 455.4 MW SP23: Actual 34 MW, Forecast 0 MW SP24: Actual -2 MW, Forecast 0 MW SP25: Actual 10 MW, Forecast 12.7 MW SP26: Actual 52 MW, Forecast 12.7 MW SP27: Actual 468 MW, Forecast 529.7 MW SP28: Actual 508 MW, Forecast 529.7 MW SP29: Actual 482 MW, Forecast 498.2 MW SP30: Actual 472 MW, Forecast 498.2 MW SP31: Actual 410 MW, Forecast 418.4 MW SP32: Actual 386 MW, Forecast 418.4 MW SP33: Actual 214 MW, Forecast 205.9 MW SP34: Actual 202 MW, Forecast 205.9 MW SP35: Actual 258 MW, Forecast 274.8 MW SP36: Actual 288 MW, Forecast 274.8 MW SP37: Actual 534 MW, Forecast 578.7 MW SP38: Actual 550 MW, Forecast 578.7 MW SP39: Actual 474 MW, Forecast 483.1 MW SP40: Actual 428 MW, Forecast 483.1 MW SP41: Actual 36 MW, Forecast 0 MW SP42: Actual -4 MW, Forecast 0 MW SP43: Actual -4 MW, Forecast 0 MW SP44: Actual 14 MW, Forecast 0 MW SP45: Actual 190 MW, Forecast 216.8 MW SP46: Actual 220 MW, Forecast 216.8 MW SP47: Actual 334 MW SP48: Actual 340 MW
Viking Link DK
-756 MW
Overperforming by
~292 MW, since SP13
MW -1000 -500 0 500 1000 1 9 17 25 33 41 48 Settlement period SP1: Actual 984 MW, Forecast 1000 MW SP2: Actual 990 MW, Forecast 1000 MW SP3: Actual 990 MW, Forecast 1000 MW SP4: Actual 990 MW, Forecast 1000 MW SP5: Actual 990 MW, Forecast 1000 MW SP6: Actual 990 MW, Forecast 1000 MW SP7: Actual 990 MW, Forecast 999 MW SP8: Actual 990 MW, Forecast 999 MW SP9: Actual 948 MW, Forecast 950 MW SP10: Actual 896 MW, Forecast 950 MW SP11: Actual 4 MW, Forecast -69 MW SP12: Actual -68 MW, Forecast -69 MW SP13: Actual -262 MW, Forecast -284 MW SP14: Actual -258 MW, Forecast -284 MW SP15: Actual 70 MW, Forecast 77 MW SP16: Actual 90 MW, Forecast 77 MW SP17: Actual 226 MW, Forecast 224 MW SP18: Actual 242 MW, Forecast 224 MW SP19: Actual 492 MW, Forecast 499 MW SP20: Actual 504 MW, Forecast 499 MW SP21: Actual 532 MW, Forecast 533 MW SP22: Actual 550 MW, Forecast 533 MW SP23: Actual 970 MW, Forecast 1000 MW SP24: Actual 986 MW, Forecast 1000 MW SP25: Actual 924 MW, Forecast 924 MW SP26: Actual 902 MW, Forecast 924 MW SP27: Actual 508 MW, Forecast 482 MW SP28: Actual 486 MW, Forecast 482 MW SP29: Actual 434 MW, Forecast 423 MW SP30: Actual 426 MW, Forecast 423 MW SP31: Actual 312 MW, Forecast 294 MW SP32: Actual 314 MW, Forecast 294 MW SP33: Actual 482 MW, Forecast 488 MW SP34: Actual 488 MW, Forecast 488 MW SP35: Actual 420 MW, Forecast 407 MW SP36: Actual 410 MW, Forecast 407 MW SP37: Actual 236 MW, Forecast 216 MW SP38: Actual 224 MW, Forecast 216 MW SP39: Actual 124 MW, Forecast 108 MW SP40: Actual 120 MW, Forecast 108 MW SP41: Actual 144 MW, Forecast 138 MW SP42: Actual 138 MW, Forecast 138 MW SP43: Actual -56 MW, Forecast -77 MW SP44: Actual -78 MW, Forecast -77 MW SP45: Actual -352 MW, Forecast -377 MW SP46: Actual -374 MW, Forecast -377 MW SP47: Actual -568 MW SP48: Actual -578 MW
Generation by fuel type, from Elexon's FUELINST dataset (published every 5 minutes) ·
wind is shown as actual + capacity instructed off via the Balancing Mechanism, same correction
as the Fundamentals tab's wind chart · interconnector flows are excluded from Generation
Mix (see the Interconnectors tab) · embedded solar isn't in FUELINST and isn't shown there.
Generation Mix
Wind: 19,419 MW (42.8%) Gas (CCGT): 17,277 MW (38.1%) Nuclear: 5,123 MW (11.3%) Biomass: 3,110 MW (6.9%) Other: 263 MW (0.6%) Hydro: 189 MW (0.4%) 43% 38% 11% 7%
All fuel types
Wind42.8%
Gas (CCGT)38.1%
Nuclear11.3%
Biomass6.9%
Other0.6%
Hydro0.4%
Generation Type
current snapshot · Fossil Fuels / Renewables / Low Carbon / Other ·
Renewables includes embedded solar, Low Carbon includes nuclear plus long-term low-carbon imports
(French, Norwegian), Other includes biomass, pumped storage and every other import leg
MW 0 5,000 10,000 15,000 20,000 25,000 Gas (CCGT): 17,277 MW (100.0%) 17.3GW 36% Fossil Fuels Wind: 19,419 MW (90.1%) 19.4GW Solar: 1,944 MW (9.0%) 1.9GW Hydro: 189 MW (0.9%) 45% Renewables Nuclear: 5,123 MW (93.4%) 5.1GW France imports: 364 MW (6.6%) 11% Low Carbon Biomass: 3,110 MW (88.7%) 3.1GW Other: 263 MW (7.5%) BritNed: 134 MW (3.8%) 7% Other
Carbon Intensity
NESO's own Carbon Intensity API (not Elexon) · center figure is the CI of
the grid overall for the current half-hour, based on NESO's CI forecast — 'point of
generation', not lifecycle, emissions · donut shows how each source contributes to those emissions
by %, using the same latest 5-minute generation data as Generation Mix
Gas (CCGT): 92.7% of emissions -- 394 gCO2/kWh x 17.28 GW Biomass: 5.1% of emissions -- 120 gCO2/kWh x 3.11 GW Other: 1.1% of emissions -- 300 gCO2/kWh x 0.26 GW Netherlands imports: 0.9% of emissions -- 474 gCO2/kWh x 0.13 GW France imports: 0.3% of emissions -- 53 gCO2/kWh x 0.36 GW 93% 5%
144 gCO2/kWh (moderate)
Gas (CCGT)92.7%
Biomass5.1%
Other1.1%
Netherlands imports0.9%
France imports0.3%
Methodology & attribution
Hover a slice to see its own CI factor and how it's calculated. Figures for
imports are separated by country where NESO publishes a distinct factor (France, Netherlands, Ireland)
— CI varies a lot by source grid, e.g. France is mainly nuclear while Irish imports have a
relatively high proportion of fossil fuels in the mix. Every other import country is grouped as "Other
imports" using the generic factor, since NESO doesn't publish a country-specific one for those links.
Battery and Pumped Storage are treated as zero CI at point of generation. Data updates every 5 minutes.
See NESO's Carbon
Intensity site for a list of CIs used and to search historical CI data going back to 2009.
Contains BMRS data © Elexon Limited copyright and database right 2026.
Uses NESO's Carbon Intensity API.
GB Power Flow
today so far · BM Generation, Imports, LV Wind and Embedded Solar feed the
central generation-mix donut, which in turn feeds Pumped Storage, Exports and Other demand · Total
Demand is Transmission System Demand (ITSDO) plus embedded wind/solar, not the Fundamentals tab's Demand
figure (INDO) — the two don't reconcile against generation the same way · "Other demand" is a
residual (distribution-level demand, transmission losses and generators' own station load, combined) since
station load has no public GB-wide figure of its own
Generation
BM Generation
Wind: 17,387 MW (40.1%) Gas (CCGT): 17,277 MW (39.9%) Nuclear: 5,123 MW (11.8%) Biomass: 3,110 MW (7.2%) Other: 263 MW (0.6%) Hydro: 189 MW (0.4%)
43.16 GW
BM Generation: 43.16 GW Imports: 0.50 GW LV Wind: 2.03 GW Embedded Solar: 1.94 GW
47.14 GW
GB Production
Total Demand 46.17 GW ·
Net Demand 42.89 GW
Demand
Pumped storage (charging)
0.01GW